HAVMEKSAN Heating Systems, Cooling Systems, Ventilation Systems, Fire Protection Systems, Plumbing Systems, Automatic Control Systems, Medical Gas Systems, Industrial Mechanical Systems, Cleanroom HVAC Systems

The project includes a conference hall with a capacity of 1,000 people, a 400 m² restaurant, and three separate foyer areas. All of these spaces were air-conditioned using air handling units. The project was completed within 12 months.

Products Used

22 Air Handling Units

20 Cell-Type Exhaust Fans

1 Chiller Unit

6 Air Handling Units

8 Cell-Type Exhaust Fans

2 Heating Boilers

8 Heating and Cooling Circulation Pumps