HAVMEKSAN Heating Systems, Cooling Systems, Ventilation Systems, Fire Protection Systems, Plumbing Systems, Automatic Control Systems, Medical Gas Systems, Industrial Mechanical Systems, Cleanroom HVAC Systems

Atatürk University Faculty of Pharmacy

Ventilation systems were installed throughout the entire building. After the ventilation installation project was prepared by our company, its implementation was carried out accordingly. The systems listed above and the connected ventilation installations were completed. The project was completed within a total of 8 months.

Products Used

3 Air Handling Units

4 Cell-Type Exhaust Fans

1 Roof-Type Exhaust Fan


Atatürk University Yakutiye Hospital

The hospital was constructed with a radiator-based heating system and an HVAC-based cooling and ventilation system. As a research and application hospital, it includes all necessary departments and units. The project consists of one 10-story block and five 4-story blocks. All operating rooms, intensive care units, and similar critical areas are conditioned using hygienic ventilation systems. The project was completed within a total of 3 years. Heating, cooling, ventilation, fire protection, plumbing, and automatic control systems were installed throughout the entire hospital.

Products Used

1 Air-Cooled Chiller Unit

30 Air Handling Units

5 Hygienic Air Handling Units

40 Steam Humidifiers

32 Cell-Type Exhaust Fans

11 Ducted Type Air Conditioners

24 VAV CAV Units

1 Water Tank (100 Tons)

1 Fire Booster Pump

1 Domestic Water Booster Pump

2 Boilers

6 Heating Circuit Plate Heat Exchangers

24 Heating and Cooling Circulation Pumps