HAVMEKSAN Heating Systems, Cooling Systems, Ventilation Systems, Fire Protection Systems, Plumbing Systems, Automatic Control Systems, Medical Gas Systems, Industrial Mechanical Systems, Cleanroom HVAC Systems

Bilkent University Computer Engineering Faculty

Ventilation and Air Conditioning Systems

In the faculty building, ventilation systems providing exhaust and fresh air were installed in all classrooms. In computer training rooms, cooling was provided using ducted-type air conditioning systems. Exhaust ventilation systems were installed in all common areas of the building. The project was completed within 12 months. The project was carried out on a partial material supply basis.

Products Used:


Bilkent University Faculty of Economics and Administrative Sciences

Ventilation and Air Conditioning Systems

All lecture halls in the faculty building were air-conditioned using air handling units. All rooms were conditioned using fan coil systems. The project was completed within 6 months.

Products Used:


Bilkent University Faculty of Electrical and Electronics Engineering

Ventilation and Air Conditioning Systems

Ventilation and air conditioning systems were installed for 3 lecture halls, 1 conference hall, 4 laboratories, and restroom areas. The project was completed within 8 months.

Products Used:


Bilkent University Main Campus Sports Hall

Ventilation and Air Conditioning Systems

All areas in the project are heated, cooled, and ventilated via air handling units. The existing air handling unit was dismantled and reinstalled by our company. All ventilation ductworks were manufactured and installed by our company. The project was completed within 8 months.

Products Used:

5 Cell-Type Exhaust Fans

10 Air Handling Units