The entire heating, cooling, ventilation, wastewater, plumbing, fire protection, and automatic control systems of the project were completed by our company on a turnkey basis. The conference hall was air-conditioned using an air handling unit, the general areas were heated through radiator systems, and the sports hall was conditioned using warm air heaters. The project was completed within 18 months.
Products Used
2 Condensing Heating Boilers
1 Chiller Unit
2 Cell-Type Exhaust Fans
1 Air Handling Unit
1 Fire Booster Pump
1 Domestic Water Booster Pump
8 Heating and Cooling Circulation Pumps
2 Modular Domestic Water and Fire Water Storage Tanks
140 Panel Radiators