We worked only as the subcontractor for the ventilation installation in this project. The showroom was air-conditioned using air handling units, while all other spaces were conditioned with fan coil systems. The project was carried out by us on a partial material supply basis and was completed within 24 months. The equipment listed below was installed by our company and integrated into the system. In addition to these units, all ventilation ductworks and installations were manufactured and installed by our company. Furthermore, the exhaust chimney systems of the paint drying ovens were also installed by us.
Products Used
4 Heating Boilers
2 Water-Cooled Chillers
70 Air Handling Units
50 Cell-Type Exhaust Fans
20 Boilers
10 Plate Heat Exchangers
4 Domestic Water Booster Pumps
94 Heating and Cooling Circulation Pumps