All of the heating, cooling, ventilation, sewage, plumbing, fire and automatic control installations in the project were made by us as a key delivery. The conference room is climated with air conditioning unit and the rooms are heated with radiator installation and sports room hot air units. The project is completed in 18 months.
Used Products
- 2 Heating Units (with condensation)
- 1 Unit Cooling Group
- 2 Units Cell Aspirator
- 1 Air Handling Unit
- 1 Unit Fire Hydrophore
- 1 Unit Using Water
- 8 Units Heating - Cooling Circulation Pump
- 2 Units Tap Water and Fire Water Modular Storage
- 140 Groups Radiator