Medical installment and heating, cooling, ventilation works are done in the project. All heating and cooling system is done with a hidden ceiling type fancoil device. 2 medical care and 4 operating room in the project are heated and cooled through hygenic conditioner. The project has all the units that should be in a full-fledged hospital. The project is completed in 18 months
Used Products:
- 2 Units Heating Caldrons
- 1 Unit Air Cooled Group
- 10 Air Handling Units
- 2 Hygienic Air Handling Units
- 12 Units Cell Aspirator
- 1 Unit Roof Top Air Conditioner
- 1 Unit Fire hydrafor
- 1 Unit Using Water Hydrafor
- 8 Units Heating - Cooling Circulation Pump
- 2 Units Laminar Flow Devices
- 3 Units Steam Moisturizer